No Products in Your Cart
Mini Floating Shelves[4/4 · 2ft · 5-Pack]
One pack. One build. All 5 boards used. • Makes 2 shelves
Shop Black Walnut 4/4 · 2ft Pack Shop All Speciesselect 2' Lengths
*Exotic — not available for shipment to US customers.
Two compact 20" floating shelves for a bathroom, a bedside wall or the space above a desk. Each shelf is two boards edge-glued, and it screws down onto a slim hardwood ledger fixed to the wall. From the front the ledger reads as a thin shadow line under the back edge. One 2ft pack makes both shelves and both ledgers.
Quick Build — for experienced woodworkers
| Part | Qty | From | S4S size | S2S size |
|---|---|---|---|---|
| Shelf pieces | 4 | Boards 1–4 | 20" × 4" × ¾" | 20" × 3½" × ⅞" |
| Wall ledgers | 2 | Board 5, ripped in half | 20" × 1 15/16" × ¾" | 20" × 1 11/16" × ⅞" |
Shelves: 2 boards edge-glued, grain running the long way.
Ledger: half of board 5, on edge, flat face to the wall, #10 × 3" screws into the studs.
Shelf to ledger: 4 counterbored #8 screws down into the ledger, ⅜" wood plugs. No glue, so the shelf can come down.
Finished size: S4S 20" L × 8" D × ¾" thick, ledger 1 15/16" tall · S2S 20" × 7" × ⅞", ledger 1 11/16" tall.
Before You Start
Shopping List
- 1 lumber pack — 4/4 · 2ft (S4S or S2S)
- Wood glue (Titebond II or III)
- 4 × #10 × 3" wood screws (plus 2 rated anchors if a stud doesn't line up)
- 8 × #8 flat-head screws: 1¼" (S4S) or 1½" (S2S)
- 8 × ⅜" wood plugs (or cut your own from offcuts)
- Sandpaper 120 / 180 / 220
- Finish: wipe-on oil, hardwax oil or water-based poly
Tools
- Saw for crosscuts (mitre saw or circular saw with a speed square)
- Saw for rips (table saw, or circular/track saw with a guide)
- Drill/driver, countersink bit, pilot bits
- ⅜" counterbore bit (or ⅜" Forstner bit)
- Stud finder and level
- Flush-cut saw
- 3 bar clamps, 12" or longer
- Random-orbit sander or sanding block
- S2S only: jointer, straight-line rip jig or hand plane
Step-by-Step
- 1 Sort the boards. Boards 1–2 make shelf 1, boards 3–4 make shelf 2, and board 5 gives both wall ledgers. Pair boards with similar colour and grain.
- 2 Cut the shelf pieces. Square one end of boards 1–4 and crosscut each to 20". Clamp a stop block so all four match.
- 3 Glue up the shelves. Edge-glue boards 1 and 2 into a 20" × 8" shelf, and boards 3 and 4 into the second. Keep the ends flush and the faces level. Clamp, scrape the squeeze-out once rubbery, and leave overnight.
- 4 Make the ledgers. Rip board 5 down the middle with a push stick — 2 strips, each 1 15/16" wide. Crosscut both to 20" so they match the shelves.
- 5 Sand. Flatten the glue seams, then sand the shelves 120 → 180 → 220. Ease the front edges and corners. Sand the ledgers smooth — the front edge shows.
- 6 Drill the shelves. Draw a line ⅜" in from the back edge of each shelf — the centre of the ledger. Mark 4 holes on it, 2" in from each end and evenly spaced between. Drill a ⅜" counterbore ⅜" deep at each mark, then a clearance hole through.
- 7 Finish. Apply wipe-on oil, hardwax oil or water-based poly to the shelves and ledgers, 2–3 coats. Let it cure before hanging.
- 8 Hang the ledgers. Find the studs. A 20" ledger reaches two studs at 16" centres if you centre it over a stud bay. Hold the ledger on edge, its 1 15/16" face flat to the wall and its top on a level line. Pre-drill and drive one #10 × 3" screw into each stud. If only one stud lines up, use a rated anchor (25 lb or more) for the second screw.
- 9 Fix the shelves. Set the shelf on the ledger, back edge tight to the wall and ends flush. Pre-drill through the holes into the ledger and drive 4 #8 × 1¼" screws. Tap ⅜" wood plugs into the holes with a dab of glue on the plug only, flush-cut and touch up the finish.
- 1 Prep the boards. Trim ½" off each end to remove any end checks. Joint one edge straight, then rip the other edge parallel (¼" off each rough edge is our planning allowance). S2S boards finish ⅞" thick, so screws and some sizes change — use the sizes in this column.
- 2 Sort the boards. Boards 1–2 make shelf 1, boards 3–4 make shelf 2, and board 5 gives both wall ledgers. Pair boards with similar colour and grain.
- 3 Cut the shelf pieces. Square one end of boards 1–4 and crosscut each to 20". Clamp a stop block so all four match.
- 4 Glue up the shelves. Edge-glue boards 1 and 2 into a 20" × 7" shelf, and boards 3 and 4 into the second. Keep the ends flush and the faces level. Clamp, scrape the squeeze-out once rubbery, and leave overnight.
- 5 Make the ledgers. Rip board 5 down the middle with a push stick — 2 strips, each 1 11/16" wide. Crosscut both to 20" so they match the shelves.
- 6 Sand. Flatten the glue seams, then sand the shelves 120 → 180 → 220. Ease the front edges and corners. Sand the ledgers smooth — the front edge shows.
- 7 Drill the shelves. Draw a line 7/16" in from the back edge of each shelf — the centre of the ledger. Mark 4 holes on it, 2" in from each end and evenly spaced between. Drill a ⅜" counterbore ⅜" deep at each mark, then a clearance hole through.
- 8 Finish. Apply wipe-on oil, hardwax oil or water-based poly to the shelves and ledgers, 2–3 coats. Let it cure before hanging.
- 9 Hang the ledgers. Find the studs. A 20" ledger reaches two studs at 16" centres if you centre it over a stud bay. Hold the ledger on edge, its 1 11/16" face flat to the wall and its top on a level line. Pre-drill and drive one #10 × 3" screw into each stud. If only one stud lines up, use a rated anchor (25 lb or more) for the second screw.
- 10 Fix the shelves. Set the shelf on the ledger, back edge tight to the wall and ends flush. Pre-drill through the holes into the ledger and drive 4 #8 × 1½" screws. Tap ⅜" wood plugs into the holes with a dab of glue on the plug only, flush-cut and touch up the finish.
Make It Yours
- Contrast ledger: cut the ledgers from a darker board so the shadow line stands out — walnut under maple.
- Stagger them: hang the two shelves 10–12" apart in height and offset sideways over a desk or bed.
- Bevelled front: chamfer the underside of the front edge so the shelf looks thinner.
Safety and Care
- Wear eye and hearing protection. Use a push stick for every rip under 4" wide.
- Pre-drill every screw — hardwoods split without a pilot hole.
- Mount into wall studs (or rated anchors sized for the load). Check for wires and pipes before drilling.
- These are light-duty display shelves. Keep the load under about 10 lb per shelf.
Frequently Asked Questions
Not for S4S boards — they arrive flat and square on all four sides. S2S boards need their edges straightened: a jointer, a table saw with a straight-line jig, or a hand plane all work. No jointer? Choose the S4S pack.
About 10 lb per shelf — a few paperbacks, a plant, frames or candles. It's not built for heavy books or dishes.
Put one #10 × 3" screw into the stud and a rated anchor (25 lb or more) for the other. Keep the load light on that shelf.
Yes. Use hardwax oil or water-based poly, put a coat on the end grain and the back too, and keep it away from the shower spray.
Planned offcuts only: about 3" off the end of every board. All 5 boards go into the shelves.
Yes. A 4ft pack makes two 46" shelves — we have a separate Easy Floating Shelves plan for that, with the same method.
